Fixtures, Models and Tooling 

for today's automotive industry

9194 Turbo Hot Oil Return Pipe: bolt/gasket assembly

Scope Input:

  1. Four geometrical part variations includes large and small flange ends.
  2. Assemble gasket to pipe and crimp the tabs once on the pipe.
  3. Press two bolts into the pipe.
  4. The tube flanges are not machined consistent.

Result Output:

  1. Gasket has to be loaded and sandwiched between bolts and the pipe.
  2. Loading of the bolts cannot hinder the loading of the pipe.
  3. Gasket tabs to be bent after being positioned to the pipe.
  4. Part is pin stamped upon proper assembly cycle.

 

 
 

 

Google+